Aico, a market leader in home life safety products, has commenced a phased upgrade of its emergency lighting infrastructure at its Oswestry headquarters. As part of a broader initiative involving approximately 300 fittings, the first stage focused on replacing entrance stairwell emergency luminaires with advanced Clevertronics solutions, integrated into the Zoneworks HIVE system.
Prior to the upgrade, the existing emergency lighting system operated continuously at full output (100%) regardless of occupancy. This resulted in excessive energy consumption and more critically, non-compliance with statutory requirements.
Over 70% of fittings failed to meet the minimum 3-hour duration during emergency lighting tests.
The lack of intelligent control and monitoring capabilities further complicated maintenance and regulatory reporting, posing risks to both operational efficiency and legal compliance.
To address these challenges, Aico installed Clevertronics emergency bulkhead fittings equipped with integrated occupancy sensors. These advanced fittings automatically reduce output due to the 0 and 50% outputs after five minutes of no occupancy detection and subsequently switch off, significantly reducing energy usage.
The fittings are fully integrated into the Zoneworks HIVE platform, enabling centralised monitoring, automated testing, and real-time diagnostics across the site.
Key Features:
The upgraded system ensures full compliance with the following UK emergency lighting standards and regulations:
The Zoneworks HIVE system supports these requirements by delivering automated test results, real-time alerts, and detailed analytics - enabling Aico to maintain compliance with minimal manual intervention.
This successful project was made possible through the collaborative efforts of:
Their expertise and commitment were instrumental in delivering
a solution that meets both operational and regulatory objectives.